Analysis of PMC's implementation of NMT projects in the 09-10 budget
The budget of PMC has been increasing with every passing year, with the transport sector typically getting the highest allocation. However, the allocation for non-motorized transport (NMT) in the transport sector budget is often very small. Only Rs. 54 crores (7%) was allotted to NMT friendly projects out of Rs. 814 crores earmarked for capital expenditure in the transport sector in the 2009-10 budget. Parisar recently finished a study to evaluate how many of these projects were actually completed satisfactorily by PMC.
This report presents the results of a survey of pedestrians using Foot Over-Bridges (FOBs) and Foot Under-Bridges (FUBs), as well as the findings of a usability analysis of these facilities in Pune. This study was triggered by the controversy surrounding the construction of the FUB at Goodluck chowk in Deccan Gymkhana area in late 2009.
In Pune, and India as a whole, women who cycle may be viewed from a different perspective than male